Designing Multi-Species Aquatic Exhibits for Zoos

Why hippo, penguin and otter exhibits need separate water-treatment strategies, species-aware viewing structures and centralized monitoring.

  • July 2026
  • Botao Aquarium Engineering Team

Why hippo, penguin and otter exhibits need separate water-treatment strategies, species-aware viewing structures and centralized monitoring.

One zoo can contain several aquatic engineering problems

Hippo, penguin and otter habitats differ in temperature, salinity, organic load, animal behaviour and viewing needs. Treating them as separate systems reduces cross-contamination risk and allows equipment to be sized for the actual species.

Design for peak load and physical interaction

Large animals can create short, intense waste loads and can damage exposed pipework or instruments. The engineering response includes treatment reserve, robust viewing-panel interfaces and protected equipment locations.

Central monitoring supports a distributed system

Operators can supervise temperature, flow and alarms from one interface even when the hydraulic loops remain independent. Good access and clear response procedures are as important as the control screen itself.